Supply chain7 min read

Decarbonising Metals and Aluminium in Asia

Aluminium and steel decarbonisation in Asia hinge on different levers: power source for aluminium, production route for steel. Here is what CBAM's 2026 rules require, where verification still lags, and what to ask suppliers before the next review.

On this page
  1. Why aluminium’s problem is almost entirely electricity
  2. China’s capacity ceiling and the hydropower advantage, with its limits
  3. India’s roadmap: electricity first, then nuclear, then carbon capture
  4. What CBAM actually asks suppliers for in 2026
  5. The verification bottleneck buyers should plan around
  6. Reading decarbonisation credibility: certification and production route
  7. A short list for procurement teams
  8. Where this leaves procurement teams

Key takeaways

  • Aluminium's emissions are driven almost entirely by the power source used in smelting, while steel's are driven mainly by production route (blast furnace versus scrap-based electric arc furnace).
  • China's 45.5 million tonne aluminium capacity ceiling pushed new smelting toward hydropower provinces, but hydropower output and related emissions factors vary seasonally, so annual averages can mask dry-season coal-backed production.
  • India's aluminium roadmap sequences renewables, then nuclear, then carbon capture, and expects only around a 10% emissions cut by 2030 from its proposed measures, a slower pace than many company-level targets imply.
  • CBAM's definitive regime started on 1 January 2026, and suppliers who can provide verified actual emissions data below EU default values can give their EU customers a direct cost saving.
  • CBAM verification capacity is still catching up: as of mid-2026 only a handful of EU accreditation bodies had begun accepting third-country verifier applications, so buyers should ask suppliers about verifier status now.

Decarbonising aluminium and steel in Asia means solving two different industrial problems. Aluminium’s emissions come overwhelmingly from the electricity used to smelt alumina into metal; steel’s come mostly from the blast-furnace route that burns coking coal to reduce iron ore. European buyers sourcing from Chinese, Indian, Japanese or Korean mills and smelters need separate questions for each metal, and separate ways of testing whether a supplier’s climate claims hold up.

That testing has become more urgent. The EU’s Carbon Border Adjustment Mechanism (CBAM) entered its definitive regime on 1 January 2026, covering aluminium and iron and steel alongside cement, fertilisers, hydrogen and electricity 1. Importers must buy certificates matching the embedded emissions of the goods they bring in. Buyers who can show genuinely lower emissions, rather than relying on EU default values, stand to pay less for the certificates; suppliers who can prove it stand to win the business.

Why aluminium’s problem is almost entirely electricity

Aluminium smelting is an electrochemical process, so the carbon intensity of the power supply largely determines the carbon intensity of the metal. India’s government roadmap for the sector puts the country’s average primary aluminium emission intensity at around 20–21 tCO2 per tonne, against a global average closer to 15 tCO2 per tonne, with coal supplying roughly 99% of the energy mix and electricity accounting for about 76% of the sector’s total abatement potential and around 41% of production cost 2. For a buyer, the practical consequence is simple: a supplier’s “renewable energy” percentage is close to meaningless without knowing whether it covers smelting load specifically, and whether it holds through the year rather than only in favourable months.

China’s capacity ceiling and the hydropower advantage, with its limits

China capped primary aluminium capacity at roughly 45.5 million tonnes in 2017, when four ministries required one tonne of old capacity to be retired for every new tonne built 3. That ceiling pushed new capacity toward hydropower-rich provinces: Yunnan and Sichuan now run their aluminium-power integration bases on more than 80% green electricity, and production against the capacity ceiling had reached roughly 95% utilisation by the end of 2024 3. That is a genuine, verifiable emissions advantage over coal-fired smelting. It is not, however, a constant one: hydropower output in these provinces varies with rainfall, and Yunnan has repeatedly asked smelters to curtail output during dry periods in recent years. A supplier quoting an annual average grid-emissions factor may be smoothing over weeks of coal-backed or curtailed production that a buyer’s own carbon accounting will not want averaged away.

India’s roadmap: electricity first, then nuclear, then carbon capture

India’s own aluminium decarbonisation roadmap sequences its levers rather than treating them as simultaneous options. It prioritises round-the-clock renewable power and grid connection to 2030, nuclear power including small modular reactors from roughly 2030 to 2040, and carbon capture integrated with captive coal power from 2040 onward, reflecting the cost, construction-time and permitting constraints on each 2. The roadmap’s own modelling expects only around a 10% emissions reduction by 2030 from the measures it proposes. Individual producers have published more ambitious figures against this backdrop, including renewable-capacity additions and net-zero-by-2050 commitments, but buyers should treat company-level targets as separate from, and generally faster than, what the roadmap assumes is achievable at a sector level this decade.

What CBAM actually asks suppliers for in 2026

Under the definitive regime, EU importers need authorisation, must report the embedded emissions of what they import, and must buy and surrender CBAM certificates against those emissions 1. Importers can rely on EU default emissions values or on verified actual data from the producer, and the two are not neutral choices: for cold-rolled stainless steel, for example, EU default values carried a 10% cost markup in 2026, rising to 30% from 2028, so suppliers who can substantiate emissions below the default give their EU customers a direct, quantifiable saving 4. The same logic applies across the CBAM goods list, aluminium included, even where published default values differ by product and origin.

The verification bottleneck buyers should plan around

Supplying actual, verified data is harder than it sounds in 2026 because the verification infrastructure behind CBAM is still being built out. As of 30 June 2026, only nine of the 24 EU national accreditation bodies willing to offer CBAM accreditation were ready to accept verifier applications at all, eight were willing to accredit third-country applicants, and just three (Italy’s Accredia, the Netherlands’ RvA and Sweden’s Swedac) had actually begun accepting applications from outside the EU 4. Roughly 12,000 entities had applied for CBAM authorised declarant status against only about 403 EU ETS-accredited verifiers covering all CBAM sectors between them, and the first reporting cycle requires a physical on-site visit; remote-only verification is not accepted. Our own look at how buyers are already testing supplier data against this kind of gap is in our CBAM embedded-emissions guide. The practical implication for a procurement team is to ask suppliers now which verifier they are working with and how far along accreditation is, rather than assuming “verified data” is available on demand.

Reading decarbonisation credibility: certification and production route

For aluminium, the main third-party reference today is the Aluminium Stewardship Initiative’s Performance Standard, whose “ASI Method” sets cradle-to-gate emissions-intensity reduction slopes benchmarked against the IEA’s Net Zero Scenario and the International Aluminium Institute/Mission Possible Partnership 1.5°C pathways 5. ASI’s own working group was still consulting in mid-2025 on whether to also recognise SBTi-validated targets, with guidance expected to follow. SBTi itself has not yet published sector-specific criteria for aluminium: its aluminium sector page confirms the initiative is still gathering evidence, with a call-for-evidence survey that remained open until 11 September 2026 6. In practice, that means a supplier’s SBTi-validated net-zero target today is assessed against SBTi’s general cross-sector criteria, not an aluminium-specific one, and ASI certification remains the more detailed, metal-specific reference point. For steel, the clearest and easiest-to-verify distinction is production route: scrap-fed electric arc furnace steel carries structurally lower emissions than ore-based blast-furnace steel, so asking for the production route and melt-and-pour origin of a specific order, not just a mill-wide average, is one of the highest-value questions a buyer can ask; our supplier carbon assessment checklist sets out how to frame that request.

A short list for procurement teams

Before the next supplier review, it is worth asking Asian aluminium and steel suppliers for:

  • Cradle-to-gate emissions intensity per tonne, broken down by power source (grid mix, captive coal, hydropower, renewable power purchase agreement), and whether that mix holds through the year or varies by season.
  • The specific production route behind a given order — primary (Hall-Héroult) versus secondary aluminium; blast-furnace versus scrap-based electric-arc steel — rather than a site-wide or company-wide average.
  • CBAM readiness: whether they can supply verified actual emissions data, through which accredited verifier, and realistically by when, rather than leaving the buyer to default to EU benchmark values.
  • Which third-party standard, if any, actually covers their emissions data (ASI certification, an SBTi-validated company target, or an independently audited life-cycle assessment) and what scope that standard covers.
  • How they plan for supply and emissions variability tied to their power source, such as dry-season hydropower curtailment in parts of China or renewable-availability gaps in India’s current build-out phase.

Where this leaves procurement teams

The underlying physics of aluminium and steel decarbonisation in Asia are well understood, and several of the levers, from hydropower-based smelting to scrap-based steelmaking, are already proven at scale. What is still catching up is the paperwork: sector-specific science-based targets for aluminium, CBAM verification capacity, and consistent third-country accreditation are all mid-build rather than finished. For procurement teams, that gap is also the opportunity: suppliers that can already produce facility-level, route-specific, seasonally honest emissions data are easier to buy from under CBAM and easier to defend in a sustainability audit than those offering only a company-wide percentage claim. If it would help to turn the checklist above into a structured data request for your own supplier base, talk to our team.

Frequently asked questions

Why does aluminium decarbonisation depend so much on electricity source?

Aluminium smelting is an electrochemical process, so the carbon intensity of the power supplying the smelter largely determines the carbon intensity of the metal, unlike steel where the choice of production route matters more.

Is hydropower-smelted Chinese aluminium always low-carbon?

It is generally lower-carbon than coal-fired smelting, but hydropower output in provinces such as Yunnan varies with rainfall, so an annual average emissions factor can understate dry-season production that relies on coal-backed or curtailed power.

What does CBAM's definitive regime change from 2026?

From 1 January 2026, EU importers of aluminium and iron and steel, among other goods, must report embedded emissions and buy and surrender CBAM certificates against them, using either EU default values or verified actual supplier data.

Is there an SBTi standard for aluminium yet?

Not a finished one. SBTi was still gathering evidence for sector-specific aluminium criteria in 2026, so current SBTi-validated targets for aluminium producers are assessed under general cross-sector criteria rather than an aluminium-specific methodology.

What is the single most useful question to ask a steel supplier?

Ask for the production route and melt-and-pour origin behind the specific order, not a mill-wide average, since scrap-based electric arc furnace steel carries structurally lower emissions than ore-based blast-furnace steel.

  • aluminium
  • steel
  • CBAM
  • Asia supply chains
  • decarbonisation
  • supplier verification

Sources

  1. European Commission, Carbon Border Adjustment Mechanism (accessed 8 October 2026)
  2. NITI Aayog, Government of India, Roadmap for Aluminium Sector Decarbonisation (January 2026)
  3. Shanghai Metals Market (SMM), Special Review for National Day: The Past and Present of China's Aluminum Capacity Ceiling (30 September 2025)
  4. Shanghai Metals Market (SMM), CBAM Costs Are Taking Effect, Verification Capacity Lags: What Stainless Steel Exporters Need to Know (2026)
  5. Aluminium Stewardship Initiative, Climate Working Group, Call 2 Notes (10 June 2025)
  6. Science Based Targets initiative, Aluminium sector guidance (accessed 8 October 2026)